2024 Building Directors
Brian Kroeger
Jenney Kroeger
Julie Thompson
James Wheelock
Lou Ohly
Building Two is a three-story, 24-unit building, that was built in 1969.
The heating system is a central gas-fired boiler that circulates hot water to each unit.
The units are cooled by the use of a wall-mounted air conditioning unit which is the responsibility of the unit owner.
A laundry room with coin-operated machines is located on each floor.
The building has a central water softener for hot water only.
A storage locker is assigned to each unit and is located in a common room on each floor.
5/3/24: The Indoor Pool is OPEN! Thank you for your patience!
Valhalla Management